Return Project Cases

Longqi Technology Vietnam Data Center and Hyper-Converged Infrastructure Project

Jingwang Technology supplied Lenovo servers and Sangfor hyper-converged infrastructure for the Longqi Technology Vietnam project, including installation and commissioning to support ERP, production, and office data center applications.

Project Information

Project Client

Dragon Flag Technology (Vietnam) Co., Ltd.

Project Location

Bac Ninh, Vietnam

Solution Brand

Lenovo, Sangfor

Solution and Scope of Delivery

The project utilizes Lenovo servers and Sangfor HCI. Our services cover equipment supply, HCI deployment, and configuration, bridging hardware procurement with platform implementation to provide technical support for application deployment.

Solution Principle

From an architectural perspective, HCI consolidates compute and storage resources via virtualization and provides centralized management. Enabled features depend on the platform version, licensing, and configuration.

Jingwang Technology Data Center Construction Standards Reference

Jingwang Technology Data Center Construction Craftsmanship Reference. Not a site certificate for Longqi projects.

Inside the rack, cables are organized by patch panel rows, with cable bundles routed from both sides into the patch panels. Outside the rack, cables run along the overhead tray and branch off to enter their respective racks. This organization ensures clear cable routing, making it easier to trace, adjust, and maintain the wiring later.

Images illustrate on-site details such as cabinet layout, copper cable termination, and tray cabling. The five images below are for demonstrating the company's construction standards only and do not represent actual photos from the Longqi project site.

Rack and aisle layout for server room equipment. Jingwang Technology's data center construction standards reference, not a site proof for the Longqi project.
01Server rack layout and aisle arrangement.
Server room cabinet and overhead cable management installation site, construction phase. Jingwang Technology server room construction standards reference only; not proof of Longqi project site.
02On-site installation of cabinet rows and overhead cabling infrastructure in the data center during the construction phase.
White copper cables are bundled and secured along both sides of the rack, then routed into each layer's patch panel. This reflects Jingwang Technology's data center construction standards; not a certification for Longqi project sites.
03White copper cables are bundled and secured along both sides of the rack, then routed to each layer's patch panel according to their respective levels.
Yellow copper cables are routed from the cable management areas on both sides to each layer of the patch panel, showcasing rear copper termination rather than fiber splicing. This image reflects the construction standards of Jingwang Technology's data center and does not represent the Longqi project site.
04Yellow copper cables are routed from the cable management areas on both sides to each layer of the patch panel, demonstrating rear copper termination rather than fiber splicing.
Blue cables are routed along the top cable tray and branch into the cabinets at designated locations. This image illustrates JINGWANG Technology's data center construction standards and does not represent the actual site conditions of the Longqi project.
05Blue cables are routed along the top tray and branch into cabinets at designated locations.

If you're planning a data center or hyper-converged infrastructure project in Vietnam, please share your application requirements and equipment list with us. We'll work together to confirm supply availability and on-site implementation scope.

Get Started